Manufacturing

Your shop floor data, finally connected

EpicorJobBOSSSolidWorks

OEE in one place, job costing in another, BOMs in engineering — we unify what matters and give you live leadership views from a single question.

Schedule a demo

Sound familiar?

You only learn a job is over budget after it ships — margin is already gone.
Engineering releases a BOM revision; days pass before the floor and Epicor agree on what’s current.
Maintenance logs downtime one way, production tracks OEE another — nobody trusts “the number.”
Capacity planning lives in one person’s spreadsheet — so you’re always guessing.

Try the demo: one prompt → full dashboard

Click a prompt. Charts and KPIs update for that scenario (sample data).

Generated from

“Show me OEE by production line and which Epicor jobs are behind schedule this week.”

Plant OEE MTD
81%
+3% vs last mo
Jobs on schedule
47/53
89% on-time
Behind schedule
6
-2 vs last wk
  • WO-4821 is 4 days behind — customer delivery at risk.
  • Line E at 91% OEE — best in plant for the 3rd month.
AI-generated report (sample)

Plant OEE is 81%, up 3 points. Six Epicor jobs are behind schedule; WO-4821 drives the highest delivery risk. Line D at 69% OEE — schedule a maintenance review. Recommend daily stand-up on the six at-risk work orders.

Generated from

“What’s our scrap rate by work center vs last quarter?”

Plant OEE MTD
81%
+3% vs last mo
Jobs on schedule
47/53
89% on-time
Behind schedule
6
-2 vs last wk
  • WO-4821 is 4 days behind — customer delivery at risk.
  • Line E at 91% OEE — best in plant for the 3rd month.
AI-generated report (sample)

Plant OEE is 81%, up 3 points. Six Epicor jobs are behind schedule; WO-4821 drives the highest delivery risk. Line D at 69% OEE — schedule a maintenance review. Recommend daily stand-up on the six at-risk work orders.

Generated from

“Which SolidWorks BOM revisions haven’t synced to Epicor in 7 days?”

Plant OEE MTD
81%
+3% vs last mo
Jobs on schedule
47/53
89% on-time
Behind schedule
6
-2 vs last wk
  • WO-4821 is 4 days behind — customer delivery at risk.
  • Line E at 91% OEE — best in plant for the 3rd month.
AI-generated report (sample)

Plant OEE is 81%, up 3 points. Six Epicor jobs are behind schedule; WO-4821 drives the highest delivery risk. Line D at 69% OEE — schedule a maintenance review. Recommend daily stand-up on the six at-risk work orders.

Generated from

“Labor efficiency vs quoted hours for open jobs.”

Plant OEE MTD
81%
+3% vs last mo
Jobs on schedule
47/53
89% on-time
Behind schedule
6
-2 vs last wk
  • WO-4821 is 4 days behind — customer delivery at risk.
  • Line E at 91% OEE — best in plant for the 3rd month.
AI-generated report (sample)

Plant OEE is 81%, up 3 points. Six Epicor jobs are behind schedule; WO-4821 drives the highest delivery risk. Line D at 69% OEE — schedule a maintenance review. Recommend daily stand-up on the six at-risk work orders.

Generated from

“90-day production capacity by work center.”

Plant OEE MTD
81%
+3% vs last mo
Jobs on schedule
47/53
89% on-time
Behind schedule
6
-2 vs last wk
  • WO-4821 is 4 days behind — customer delivery at risk.
  • Line E at 91% OEE — best in plant for the 3rd month.
AI-generated report (sample)

Plant OEE is 81%, up 3 points. Six Epicor jobs are behind schedule; WO-4821 drives the highest delivery risk. Line D at 69% OEE — schedule a maintenance review. Recommend daily stand-up on the six at-risk work orders.

How we connect your systems

Plain English for IT and ops: these platforms expose supported paths so data can flow into your private RapidDashboard store — not through a public chatbot.

SystemWhat we pullConnection path
Epicor ERPWork orders, job costs, schedules, inventoryOfficial REST APIs — scheduled, audited sync into your secure environment.
JobBOSS² / ECiJobs, labor, quoted vs actualVendor-supported APIs and secure exports — mapped to your KPI model.
SolidWorks PDMBOM revisions, ECO status, release statePDM Web API / file vault events — so engineering truth matches the floor.

What you can build

OEE & production

  • Real-time OEE by line
  • Downtime root causes
  • Schedule adherence

Job costing

  • Margin by job & customer
  • Labor variance alerts
  • Over-budget flags

Engineering

  • BOM sync status
  • ECO pipeline
  • Revision risk

Automated reports

  • Daily production summary
  • Weekly quality
  • Monthly capacity

Security note

Manufacturing data often includes customer contracts and drawings. RapidDashboard keeps it in a private data store with role-based access. Optional CMMC-aligned handling for defense suppliers. AI is optional and enterprise-grade — never used to train public models.

Schedule a demo