HR dashboard · Time-to-fill

Time-to-fill by occupation, ranked by vacancy cost

Days open shows how long a role has waited. Vacancy cost shows what the wait is worth, so each week of recruiting starts with the reqs that matter most to the business.

Live examples

The dashboard this question builds

KPIs, charts, the records behind them and an AI summary of what to do next. Hover any chart for values or open its table view.

Asked

Show me time-to-fill by occupation over the last 12 months, and rank open roles by what they cost while vacant.

Built in 2.4s

Time-to-fill and open req exposure

Last 12 months Greenhouse All departments

Avg time-to-fill

46 days

-5 days target 35 days

Avg time-to-hire

27 days

-3 days application to acceptance

Offer acceptance

84%

+3 pts 76 of 90 offers

Vacancy cost, open reqs

$184K

+$21K 15 open reqs, estimated

Time-to-fill and time-to-hire by month
  • Time-to-fill
  • Time-to-hire
  • Target 35 days
Time-to-fillTime-to-hire
Oct52 d30 d
Nov50 d29 d
Dec51 d29 d
Jan49 d28 d
Feb48 d28 d
Mar47 d27 d
Apr46 d27 d
May45 d26 d
Jun44 d26 d
Jul43 d26 d
Aug42 d25 d
Sep41 d25 d
Open reqs by stage
15open reqs
  • Sourcing & screening853%
  • HM interview427%
  • Final round213%
  • Offer17%
SegmentValueShare
Sourcing & screening853%
HM interview427%
Final round213%
Offer17%
Average days to fill by occupation
  • Electrical Engineers 82 days3 hires
  • Software Developers 74 days13 hires
  • Machinery Mechanics 63 days4 hires
  • Sales Reps 58 days12 hires
  • Prod. Supervisors 52 days3 hires
  • Accountants 38 days2 hires
  • Customer Service Reps 22 days5 hires
  • Assemblers 18 days16 hires

Target: 35 days

Candidate funnel, last 12 months
  1. Applied 2,140
  2. Screened 642 30%
  3. HM interview 268 42%
  4. Final round 151 56%
  5. Offer extended 90 60%
  6. Hired 76 84%
Open reqs ranked by vacancy cost
Role (SOC) Days open Stage Candidates Exposure Status
Electrical Engineer II (17-2071) 81 HM interview 3 $50,220 Over 60 days
Senior Software Developer (15-1252) 74 HM interview 3 $42,920 Over 60 days
Sales Rep, Southeast (41-4011) 62 Final round 2 $27,900 Over 60 days
Maintenance Mechanic, 2nd shift (49-9041) 66 Sourcing 0 $20,460 No pipeline
Production Supervisor (51-1011) 38 Screening 5 $10,640 Past target
Software Developer II (15-1252) 21 Screening 6 $8,820 On track

What changed and what to do

  • Critical: The two Engineering reqs have been open 81 and 74 days and carry $93K of vacancy cost. Both have finalists waiting on hiring manager interviews.
  • Warning: Seven of the 15 open reqs are at hiring manager interview or later, so scheduling and decisions now set the pace more than sourcing does.
  • Good: Assemblers fill in 18 days and Customer Service Reps in 22, both well inside the 35-day target, with employee referrals as the top source.

AI summary

Average time-to-fill over the last 12 months was 46 days against a 35-day target, improving to 41 days in September. Engineering and skilled-trade roles drive the average, while front-line roles fill in under 25 days. Offer acceptance held at 84% and cost-per-hire was $4,750. Recommend a 5-business-day decision standard after hiring manager interviews and a referral and trade-school campaign for the 2nd-shift Mechanic req.

Ask next

  • Which sources produce the fastest hires?
  • Show time-to-fill by hiring manager
  • Forecast fill dates for open reqs

Sample data for a fictional company. Your dashboards run on your own connected systems.

Why it matters

What this view changes

Ranking open reqs by vacancy cost puts the most expensive wait at the top of the list, which makes weekly recruiting priorities clear.

The stage view shows where each req is waiting, so the fix matches the step: sourcing, interview scheduling or the hiring decision.

Grouping by SOC occupation compares fill times for the same role across departments and hiring managers.

Metrics glossary

The metrics behind these dashboards

How each number is defined, so everyone reads it the same way.

Time-to-fill

Calendar days from the date a requisition opens to the date a candidate accepts the offer.

FormulaOffer accepted date − Requisition open date

Time-to-hire

Calendar days from a candidate's application to their offer acceptance. It measures the candidate experience, while time-to-fill measures the business wait.

FormulaOffer accepted date − Application date

Offer acceptance rate

The share of extended offers that candidates accept.

FormulaOffers accepted ÷ Offers extended × 100

Cost-per-hire

Total external and internal recruiting cost divided by the number of hires, as defined in the ANSI/SHRM cost-per-hire standard.

Formula(External costs + Internal costs) ÷ Total hires

Vacancy cost

The estimated value of work not done while a role sits open.

FormulaDays open × Estimated daily value of the role

Connections

How your systems connect

Supported APIs and exports sync into a private RapidDashboard store you approve. Dashboards read from that store, so source systems keep their normal load.

Greenhouse

PullsRequisitions, pipeline stages, interviews, offers, sources

Harvest API on a scheduled, audited sync into your private store.

Lever

PullsPostings, opportunities, stage changes, offers

Vendor-supported API. Candidate data stays inside your approved environment.

BambooHR, Rippling

PullsStart dates, departments, pay for vacancy cost estimates

Official HRIS APIs, joined to each requisition so fill time ends on the real start date.

Candidate data stays in your environment

Recruiting dashboards include candidate names, stages and offer details. RapidDashboard keeps them in a private data store, limits candidate-level views to recruiters and hiring managers on each req, and follows the retention rules set in your ATS. AI features are optional and run on enterprise endpoints whose terms prohibit training on your data.

FAQ

Time-to-Fill dashboards: common questions

What is the difference between time-to-fill and time-to-hire?

Time-to-fill runs from the day a requisition opens to the day a candidate accepts, so it measures how long the business waits for the role. Time-to-hire runs from a candidate's application to acceptance, so it measures how quickly the process moves once a candidate is in it.

How is cost-per-hire calculated?

Cost-per-hire is total external recruiting costs, such as agency fees and job ads, plus internal costs, such as recruiter time, divided by the number of hires in the period. This follows the ANSI/SHRM cost-per-hire standard.

What is a good time-to-fill?

Averages of roughly six weeks are widely cited across industries, and skilled technical roles often take longer. The most useful target is set by occupation, then tracked against your own trend, which is how this dashboard compares each role with a 35-day goal.

Can RapidDashboard connect to Greenhouse and Lever?

Yes. Greenhouse and Lever connect through their vendor-supported APIs, and the data syncs on a schedule into a private store. RapidDashboard joins it with HRIS start dates and pay, so fill time and vacancy cost sit in one view.

See dashboards like these on your own data

Fifteen minutes with an AIBMM™ Certified Coach: bring one question, leave with the dashboard it would build on your systems.

Schedule a demo