Manufacturing dashboards

Your shop floor data, connected and live

OEE lives in one system, job costing in another, BOMs in engineering. RapidDashboard joins them in a private data store and answers plain-English questions with a full leadership dashboard.

Live examples

One question, one full dashboard

Pick a question. RapidDashboard answers with KPIs, charts, the records behind them and an AI summary of what to do next. Hover any chart for values or open its table view.

Asked

Show me OEE by production line and which Epicor jobs are behind schedule this week.

Built in 1.8s

Plant performance

Week 40 Plant: Main Shift: All

Plant OEE

81.4%

+3.1 pts vs last month

Availability

90.2%

+1.4 pts unplanned stops down

Jobs on schedule

47 / 53

89% on-time this week

Behind schedule

6

-2 vs last week

OEE by line, last 12 weeks
  • Line A
  • Line B
  • Line C
  • Line D
  • World-class 85%
Line ALine BLine CLine D
W2982%70%76%74%
W3083%71%77%73%
W3184%72%78%72%
W3283%71%79%73%
W3385%73%78%71%
W3486%72%80%72%
W3585%73%81%70%
W3686%74%80%71%
W3787%73%81%70%
W3886%74%82%69%
W3987%74%81%70%
W4087%74%82%69%
This week vs 85% target
  • Line A 87%
  • Line C 82%
  • Line B 74%
  • Line D 69%

Target: 85%

Epicor jobs behind schedule
Work order Customer Part Due Complete Status
WO-4821 Northfield Hydraulics Manifold block 7A Oct 3 58% 4 days late
WO-4807 Delta Agri Systems Pivot housing Oct 4 71% 2 days late
WO-4833 Kessler Marine Shaft coupler Oct 6 64% 1 day late
WO-4840 Northfield Hydraulics Valve body 3C Oct 7 80% At risk
WO-4812 Ridgeway Fluid Power Pump end cap Oct 8 86% Recovering

What changed and what to do

  • Critical: WO-4821 for Northfield Hydraulics is 4 days behind and 58% complete. The Oct 3 delivery needs a second shift on Line D or a customer call today.
  • Warning: Line D OEE has slipped 5 points in 12 weeks. Availability losses cluster on Monday first shift, which points to start-up and changeover.
  • Good: Line A held 87% OEE for the third straight week, above the 85% world-class mark.

AI summary

Plant OEE reached 81.4%, up 3.1 points on last month, driven by better availability on Lines A and C. Six Epicor jobs are behind schedule; WO-4821 carries the highest delivery risk. Line D is the one line trending down, so the recommended next step is a changeover review on Line D and a daily stand-up on the six late work orders until they recover.

Ask next

  • Why is Line D down on Mondays?
  • Which customers have late jobs?
  • Show changeover time by line

Sample data for a fictional company. Your dashboards run on your own connected systems.

Sound familiar?

Where the numbers live today

Job margin shows up late

Job cost variance surfaces when the job ships, after the hours are already spent.

Two versions of the BOM

Engineering releases a revision and the floor and Epicor catch up a few days later.

More than one OEE number

Maintenance logs downtime one way and production tracks OEE another, so meetings start by reconciling.

Capacity in one spreadsheet

The 90-day load plan lives with one planner, and everyone else works from last week's copy.

Metrics glossary

The metrics behind these dashboards

How each number is defined, so everyone reads it the same way.

OEE (Overall Equipment Effectiveness)

The share of planned production time that is truly productive. 85% is widely cited as world-class for discrete manufacturing.

FormulaAvailability × Performance × Quality

Availability

Run time as a share of planned production time, after unplanned stops and changeovers.

FormulaRun time ÷ Planned production time

First-pass yield (FPY)

Units that complete a process correctly the first time, with no rework or scrap.

FormulaGood units first time ÷ Units started

Scrap rate

Material or parts discarded as unusable, as a share of total production.

FormulaScrapped units ÷ Total units produced

Labor efficiency

How closely actual labor hours track the hours quoted or standard for a job.

FormulaQuoted (standard) hours ÷ Actual hours

Capacity utilization

Booked and forecast load as a share of the hours a work center can produce.

FormulaLoad hours ÷ Available hours

Connections

How your systems connect

Supported APIs and exports sync into a private RapidDashboard store you approve. Dashboards read from that store, so source systems keep their normal load.

Epicor Kinetic

PullsWork orders, job costs, schedules, inventory

Official REST APIs on a scheduled, audited sync into your private store.

JobBOSS² (ECi)

PullsJobs, labor tickets, quoted vs actual hours

Vendor-supported API and secure exports, mapped to your KPI model.

SolidWorks PDM

PullsBOM revisions, ECO status, release state

PDM Web API and vault events, so engineering truth matches the floor.

MachineMetrics / MES

PullsMachine states, cycle counts, downtime reasons

Streaming or hourly pulls feed live OEE by line and machine.

What you can build

Dashboards and reports teams build next

OEE & production

  • Real-time OEE by line and machine
  • Downtime root causes
  • Schedule adherence

Job costing

  • Margin by job and customer
  • Labor variance alerts
  • Quote accuracy by template

Engineering

  • BOM sync status
  • ECO pipeline
  • Jobs on superseded revisions

Automated reports

  • Daily production summary
  • Weekly quality review
  • Monthly capacity outlook

Built for customer drawings and defense work

Manufacturing data often includes customer contracts and controlled drawings. RapidDashboard keeps it in a private data store with role-based access, with optional CMMC-aligned handling for defense suppliers. AI features are optional and run on enterprise endpoints whose terms prohibit training on your data.

FAQ

Manufacturing dashboards: common questions

What should a manufacturing dashboard show?

Most plant leaders start with OEE by line, schedule adherence for open work orders, scrap and first-pass yield, labor efficiency against quoted hours, and a 90-day capacity view. RapidDashboard builds each of these from a plain-English question, so you can add the next view in a conversation.

Can RapidDashboard connect to Epicor, JobBOSS and SolidWorks?

Yes. Epicor Kinetic and JobBOSS² connect through their official APIs, and SolidWorks PDM through its Web API and vault events. Data syncs on a schedule into a private store, so dashboards stay fast and your ERP keeps its normal load.

How is OEE calculated in these dashboards?

OEE is Availability × Performance × Quality. RapidDashboard calculates each factor from machine states, cycle counts and good-part counts, and shows the factors next to the total so you can see which loss is driving the number.

How long does it take to get a live manufacturing dashboard?

A first dashboard on connected data typically takes one working session with an AIBMM™ Certified Coach. Additional views take minutes, because each one is a new question against the same data store.

Is our production data used to train AI models?

No. Your data stays in a private store you approve, and AI features run on enterprise endpoints whose terms prohibit training on customer data. AI is optional; the dashboards work without it.

See dashboards like these on your own data

Fifteen minutes with an AIBMM™ Certified Coach: bring one question, leave with the dashboard it would build on your systems.

Schedule a demo